Split Load
“Split load” functionality has been introduced to allow individual Policy Admin Systems and its associated data to be loaded independently for different load periods (backcast and incremental). PolAdmSystems can also be deleted independently (allowing for reloads if required).
This required a fundamental redesign of the core dimensional model and processes, introducing the new load control dimension PolAdmSystem and PolAdmSystemID onto all related fact tables.
The load processes have been fundamentally split into the unit dimension and fact loads. However, current loads will continue to be bundled in the standard processes: Admin, Reserve&Alloc, GL, Projection, ExpectedRates.